Technical realisation aqueduct N57 1

Technical realisation aqueduct

See pictures

Project information

Project description:

De N57 is a joint project of Rijkswaterstaat Zeeland (Department of Waterways and Public Works Zeeland), the Province of Zeeland, the municipalities of Middelburg and Veere and waterschap Scheldestromen (district water board Scheldestromen). The new N57 on the peninsula of Walcheren starts from national highway A58 at Nieuw- en Sint Joosland, passes Middelburg on the north east side and continues via Serooskerke to Vrouwenpolder. The road crosses the Kanaal door Walcheren (Walcheren Channel) in Middelburg via an aqueduct.

 

Bakker Sliedrecht Electro Industrie B.V. realised the electrical and mechanical installations, as commissioned by Strukton Civiel.

 

Delmeco performed part of the detail engineering for Bakker Sliedrecht.

In the field of electrical engineering the assignment consisted of:

  • Detail engineering pump installation;
  • Detail engineering aqueduct lighting.

Client: Bakker Sliedrecht

Bakker Sliedrecht is an international electrical engineering business for both maritime and industrial projects. Bakker Sliedrecht consults, designs, produces, assembles and repairs.

 

 

Photos: beeldbank.rws.nl

Delmeco Raadgevend Ingenieurs bureau

Marquesweg 4
4462 HD Goes, The Netherlands
info@delmeco.nl

+31 (0)113-270484